From: route@monster.com
Sent: Friday, April 15, 2016 10:20 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: CS UT
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Summary 14 years’ experience with power, telco and A&E design
walks Installation of outdoor and indoor substations 13 KVA to
277/480v. OSP and ISP experience on utility poles and underground. Extensive experience in telecommunications roof top, ground
sites and tower installations. New site build, site modifications, LTE systems, DAS
systems, microwave systems, cellular systems, fiber optic networks, AC and DC
power plants and HVAC installations. Heavy electrical background. QC Manager MEPs at Aberdeen
Proving Grounds Specialties: Project Management,
Construction Management, Utility Coordination, site constructability and
drawing design, scheduling sweep, pim and fiber optic testing, closeout
documentation and landlord relations. Computerized systems for billing,
customer support, site progress reports and site safety supervision. Secret DOD security
clearance held APG MD in 2000. PROFESSIONAL
EXPERIENCE NETWORK BUILDING and CONSULTING, Hanover MD
11-9-15 – 1-4-16 Construction Manager – Consultant
Temp Position Represented NB&C on Verizon Small Cell
site punch walks. Followed up on punch work completion, meter installations
and site surveys as required to assist the team in their 4th quarter
completions. Bechtel Communications/Talascend Resources 2-12-2012 to 10-10-14 and 9-29-15 to
10-30-15 Construction Manager - AT&T New
Site Build BAWA MCPA Upgrades and LTE Project KOP & LA Managed New Site Construction builds, Das
Equipment rooms, MCPA and LTE upgrades for AT&T sites. Design walks,
drawing review, bid walks with GC’s, bid submission; daily supervision of
site work. Material orders, acceptance and inventory of AT&T equipment.
Quality control reports with online CQI system, tracker updates, site safety
reports, construction close out packages and cost true-ups. Shelter set on ground and rooftop sites.
Crane usage up to 300 ton. Self Employed, June 11-11 to Feb 22-12. NETWORK BUILDING and CONSULTING, Hanover MD
May 2008 – June 2011 Construction Manager – Consultant OSP/ISP Comcast/T-Mobile Fiber Optic
Upgrade to T-Mobile problem sites and on BG&E, Pepco and Dominion utility
tower property. Daily over sight of construction progress and site safety. QA
punch walk with photos. CD development with Site Aqc and engineers, material
orders. Close out documentation package submittal. Shelter set and crane
usage to 300 ton. Clear wire Microwave and Equipment Upgrade
to Sprint Sites for the Washington Launch. Over sight of daily construction progress
and site safety. QA punch list with photos, ordered RF materials for team. CD
development with Site Aqc. Placed all power orders on required sites. Utility Coordinator – Consultant Cricket Communication Washington Launch
assigned to Columbia office. Responsible for submittal of power applications
to BG&E, Pepco, Smeco, Dominion and Allegheny utility companies, arranged
site visits with power companies and Verizon outside engineering, oversaw
sub-contractor bid, purchase order submission and tracking. SPRINT NEXTEL, Columbia, MD 2007 - 2008 Project Manager Responsible for cost control and bid
acceptance; PO submission and tracking; construction drawing reviews and
approvals; and over sight of other construction managers. Worked directly with GC’s to complete high
cost sites on time and within budget. Performed site quality punch list and
follow up of corrections to performed work. Reported directly to Construction
Project Manager for Baltimore/ Washington/ Northern Virginia region. SMART LINK INC, Columbia, MD2005 - 2007 Project Manager – Consultant Assigned to Sprint Nextel Mid Atlantic site
development division. Oversight of General Dynamic construction
projects. Attended all deployment and site acquisition meeting, performed
quality control walks on all General Dynamic sites. Utility Coordination (BG&E, Pepco,
Alleghany, and Smeco) and Telco (Verizon) utilities. Responsible for construction of high cost
sites that were out of General Dynamics scope of work Harkins Builders, Marriotsville, MD2003 –
2005 Supervisor - MEP’s Supervisor for tenant fit outs and
responsible for mechanical, plumbing and electrical installs on larger
projects. Performed quality control punch walks with A&E firms for MEP’s
quality control and prior to country inspections. Responsible for duct bank
and directional boring operations. Installation of storm water and sewage
piping systems. Over sight of submittal’s and TQ changes on
AIA contracts. Project takeoffs for bids and scope of work
write ups, working with Estimating Dept. and Contract Manager URS; Washington DC2000 – 2003 Lead Construction/Project Manager Assigned to Nextel Site Development
Devision. Responsible for site constructability walks with A&E firm’s and
Site Acquisition Groups to develop construction drawings. Bid sites with
multi contractors and approved payments Coordinated work schedules with
contractors, property owners and building managers. Conducted punch list for
projects. Ordered all Nextel supplied materials and
equipment shelters. Awarded construction contracts to subcontractors. Oversaw
all county and city inspections Processed purchase orders and subcontractor
requisition approval; completed quality control punch list. Set up of all required county/city
inspections. Co-locations on Crown Castle, Global Signal, Spectra site,
Sprint, AT&T, American Tower, utility transmission and private owned
towers. R & R International & Toltest Inc.
Aberdeen Proving Grounds, MD1998 - 2000 Quality Control Manager MEP’s - APG
Job Order Contract Managed QC on
electrical/mechanical/plumbing projects including environmental division. Conducted all punch walks with Department
of Contracting to conform to local codes and job specifications, warranty
issues and safety checks with Dept. of Environmental Health and Safety.
Oversight of duct banks, and direction bores for electrical lines and the
installation of concrete pipe systems for storm water and sewage. Completed as-built drawings on current and
past projects. Worked with project managers to solve electrical /mechanical
& building problems encountered on projects. Performed Electrical Mechanical Takeoffs
for Estimating Department EDUCATION Journeyman Electrician, Harford County
Electrical Apprenticeship, Harford Community College 4 Year program Harford Community College, 42 credits
Business-no degree Community College of the Air Force, Computer Operation
Certification for Burroughs and Honeywell systems, C-130B Aircrew Loadmaster
Certification. OSHA 30, Trained Through Bechtel. USACE
Construction Quality Management for Contractors certification MILITARY
EXPERINCE Maryland
Air National Guard,
1977 to 1986 E-5 Honorable Discharge |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Advanced |
|
|
|